top of page
Newspapers

AUTHENTISE NEWS

Find all of Authentise's press releases, dev blogs and additive manufacturing thought pieces right here.

Industry 4.0 for SMEs: A Practical Manufacturing Guide

Apr 10, 2025
10 min read

Updated: 3 days ago

If your team spends too much time chasing job updates, checking drawing revisions or assembling production records, start there. A practical approach to Industry 4.0 for SMEs is to choose a recurring manufacturing problem, establish what it costs, test a manageable improvement and measure the result before expanding.


That sounds straightforward. The difficulty is choosing between competing priorities when the same people keeping production running also have to implement the change.

This guide explains how to assess your starting point, select a first project, budget for the work and decide whether a pilot is ready to become part of everyday production.

Manufacturing team reviewing a digital job board, with connected engineering drawings, production equipment and inspection records in a small workshop.


What does Industry 4.0 mean for an SME manufacturer?

Industry 4.0 connects manufacturing equipment, software and data so teams can monitor work and coordinate production more effectively. For SMEs, a practical starting point is a recurring problem: chasing job updates, checking drawing revisions or assembling production records. Establish what the problem costs, test a manageable improvement and measure the result before expanding.


For a smaller manufacturer, its value depends on what those technologies help people do.

An operator might record a completed operation against a work order, making its status available to planning. A quality engineer might retrieve inspection records without searching several folders. A production manager might see that material has not been released before committing a job to the schedule.


These are practical changes to how work happens. Their usefulness does not depend on owning every technology associated with a smart factory.

It also helps to distinguish three related activities:

Activity

Manufacturing example

Digitisation

Converting a paper inspection sheet into a digital file

Digitalisation

Capturing inspection results against the relevant job and making them available to quality

Digital transformation

Changing responsibilities, decisions and working practices around that information

A scanned document may be easier to store, but somebody may still need to find it, interpret it and enter its contents elsewhere. The larger improvement comes when the information reaches the person who needs it at the right point in the process.


Made Smarter’s digital transformation roadmap for SME manufacturers discusses these distinctions and the role of people in making digital adoption work.


Follow one job before choosing a system

Start with a recent order that experienced delays, repeated checks or unnecessary administration. Follow it from the initial request through engineering, production, inspection and delivery.


Ask the people doing the work to show you what happened. Include the spreadsheet maintained beside the official system, the printed drawing marked up during a shift and the email used to confirm an approval.


Record where people had to:

  • Copy information between systems.

  • Search for a document or ask which revision to use.

  • Wait for a decision without knowing who owned it.

  • Chase another department for a status update.

  • Reconstruct records after production finished.


Separate necessary work from avoidable effort. An engineering review may be essential; waiting two days because nobody knew the review was required is a different problem.

For example, a job might spend only a short time in inspection but wait much longer for its documentation to be assembled. Buying faster inspection equipment would do little to address that delay.


This exercise also prevents a common purchasing mistake: selecting software for the process described in a procedure while overlooking the workarounds people rely on to deliver orders.


Check whether the process is ready to change

A readiness assessment should reveal what needs attention before implementation. The following questions are discussion prompts, rather than a formal maturity score.

Area

Questions to ask

What to resolve

Process

Can people explain how the job should move through production? Who handles exceptions?

Unclear steps, inconsistent practices or missing decision owners

Information

Can records be associated with the correct order, part and revision?

Conflicting identifiers, duplicate files or unreliable status information

People

Who will use the new approach? Can they help design and test it?

Missing involvement, training time or operational cover

Technology

What systems already support this work? How can they exchange information?

Access, connectivity, device and integration constraints

Control

Who may view, change, approve or release information?

Permissions, approval rules, record retention and recovery arrangements

Measurement

Can you establish current performance?

Missing baselines or inconsistent definitions

Readiness does not require perfect data across the whole business. It requires enough control over the chosen process to understand whether the change helps.


Suppose engineering and production use different part identifiers. A pilot that transfers drawing information between them needs a reliable way to associate those records. That issue should be resolved within the pilot’s scope before automatic transfer is trusted.


The assessment may also show that an existing system can solve the problem through better configuration or working practices. Include that option before purchasing another tool.


Choose a first project with a clear operational owner

The first project should matter enough to justify the effort while remaining small enough to manage.


Look for a recurring problem with an identifiable owner, accessible information and a result you can observe. Avoid making the first project depend on replacing several major systems simultaneously.


Useful candidates might include:

Problem

Possible first project

Evidence to collect

Planners repeatedly chase job status

Capture progress for one production route

Time spent chasing updates and completeness of status records

Operators struggle to identify approved instructions

Provide controlled access for one part family

Retrieval time and incidents involving unclear revisions

Quality assembles records after each job

Capture required evidence as work progresses

Record completeness and time spent compiling the final package

Work waits for an unclear approval

Introduce an owned approval step for one process

Waiting time, overdue approvals and exceptions

Material status is checked manually before scheduling

Make release status visible for a defined material group

Status-related delays and accuracy of availability information

Compare candidates against business impact, implementation effort, operational risk and readiness. A simple discussion matrix is sufficient; a complicated scoring model can create false precision.


Write the project objective in terms that production can recognise:

Reduce the time planners spend establishing the status of jobs on the selected route, while maintaining accurate production records.

That gives the team something to test. “Implement a digital platform” describes an activity without explaining what should improve.

Match the technology to the problem

Once the problem is clear, consider which technology could address it and what must be in place for it to work.


Production software and manufacturing execution systems can coordinate work orders, production steps, records and status. Their suitability depends on the workflows they support and how they fit existing systems.


Machine connectivity and industrial IoT can supply equipment data. Establish what each signal means before using it to drive decisions. A machine reporting “running” does not necessarily establish that an accepted part is being produced.


Workflow automation can handle repeatable actions such as notifications, task creation and routing. Define exceptions and human approval points before automating decisions with quality or safety consequences.


Analytics and AI can support analysis, prediction or information retrieval where the data and use case are suitable. Test outputs against the intended task and establish who remains responsible for acting on them.


Robotics, additive manufacturing, AR and digital twins may address particular production needs. Each requires its own assessment of suitability, cost and operating requirements. A manufacturer improving job visibility does not automatically need a digital twin.


Ask suppliers to demonstrate the proposed approach using a representative job, including something going wrong. A polished demonstration of the normal route tells you little about how the system handles a rejected inspection, unavailable material or revised instruction.


Make usability part of the specification

SMEs need technology their team can use effectively, with clear arrangements for administration, maintenance and support. That makes usability a purchasing requirement.


An operator recording progress may be wearing gloves, sharing a terminal or working with an intermittent connection. An engineer approving a change needs enough information to understand its effect. A planner needs to distinguish a reliable update from an old one.


Include these conditions in demonstrations and pilot testing. Ask users to complete actual tasks and observe where they hesitate or create workarounds.

Check:

  • How many actions common tasks require.

  • Whether terminology matches the shop floor.

  • How users correct an incorrect entry.

  • What happens when connectivity is lost.

  • Whether information is accessible without unnecessary permissions.

  • How training and ongoing support will work.


Ease of use does not remove the need for training. People still need to understand the process, their responsibilities and how to handle exceptions.


However, repeated difficulty with a basic task may indicate a design problem. Do not assume that another training session will resolve an awkward workflow.


Give people responsibility and time

A project can have management approval and still stall because nobody has time to deliver it.


Assign responsibility before implementation begins. In a small business, one person may cover several roles, but the responsibilities should remain explicit.

Responsibility

What it involves

Business sponsor

Approves resources, resolves competing priorities and reviews the business case

Process owner

Defines how the work should operate and accepts the resulting process

User representatives

Test daily tasks and identify practical problems

Technical lead or provider

Manages configuration, integration, access and technical support

Quality representative

Confirms relevant controls, records and acceptance requirements

Measurement owner

Establishes the baseline and checks results

Protect time for workshops, data preparation, testing and training. If an operator participates in testing, somebody may need to cover their production work.


Explain what the project is intended to improve and how the resulting data will be used. A tool introduced to reduce status chasing may be received differently if staff believe it is being introduced to monitor individual performance.

That conversation belongs at the beginning.


Budget for implementation as well as software

The subscription or licence fee is only one part of the cost.

Include configuration, data preparation, integration, devices, connectivity, internal staff time, training and any temporary arrangements needed during the transition. Then consider recurring costs such as support, additional users, storage and maintaining connections to other systems.


For additive manufacturing teams evaluating production software, our guide to comparing the cost of an additive MES explains how to assess setup, integration, training and recurring charges across supplier proposals.


Ask how the price changes if the pilot expands. Adding another department or site may introduce different requirements rather than simply multiplying the number of licences.

Build the business case around benefits you can explain and measure. These might include less administration, fewer avoidable errors, shorter queues or more reliable delivery information.


Be careful with time savings. Releasing engineering time creates capacity, but it does not automatically reduce payroll expenditure.


For illustration, suppose a pilot releases four hours of administrative work each week for 46 weeks. That creates 184 hours of capacity. At an assumed loaded labour cost of £30 per hour, its estimated value is £5,520.


Those are hypothetical inputs, not an expected result. The business still needs to establish how the released time will be used and compare the benefit with implementation and running costs.


Avoid counting the same improvement twice. Reduced status chasing and reduced administrative labour may describe the same benefit.


Design a pilot that can earn a rollout decision

A useful pilot tests both the technology and the proposed way of working.

Choose a defined scope: perhaps one production route, part family or team. Include representative work and relevant exceptions. Testing only the easiest jobs can conceal problems that appear immediately after rollout.


Before starting, agree:

  1. The baseline: current performance over a representative period.

  2. The intended improvement: the result the project is meant to deliver.

  3. The acceptance criteria: what must work reliably.

  4. The review point: when enough evidence should be available.

  5. The contingency: how work continues if the pilot approach fails.


For a production-status pilot, acceptance might require users to record agreed events, planners to retrieve current information and the team to resolve incorrect entries without losing the record.


Quality or traceability requirements should form part of acceptance where relevant. A reduction in administration is insufficient if required evidence becomes harder to retrieve.

Choose the pilot duration around the process. A route with long production cycles may need more time to generate useful evidence than one processing many short jobs.


If you are evaluating software for additive production, our guide to running an additive manufacturing workflow software pilot provides example acceptance criteria and a scorecard for recording results, workarounds and unresolved questions.


Measure the result without hiding the trade-offs

Use a small set of measures linked to the original problem. Agree their definitions so that before-and-after comparisons mean something.


For a job-visibility project, useful measures could include:

  • Time spent establishing job status.

  • Completeness and timeliness of updates.

  • Accuracy of status information checked against the work.

  • Additional recording effort for operators.

  • Use of parallel spreadsheets or informal workarounds.


The last two matter. A project that saves planning time by creating a larger burden on production may need redesigning.


Account for changes in workload and job mix. A quieter month does not prove the software shortened lead times. Compare similar work where possible and document factors that limit the comparison.


Ask users what remains difficult. If the official system shows high adoption while staff still maintain a separate spreadsheet, investigate what that spreadsheet provides.


Expand through connected improvements

The marginal-gains idea from cycling offers a useful reminder: small improvements deserve attention. For manufacturing, though, the connection between improvements matters.


Making job status visible may reveal that work repeatedly waits for material release. Once that problem is addressed, inspection capacity may become the next constraint.

This gives the business a reasoned sequence for investment. Review what the first change revealed, update the roadmap and choose the next problem.


Avoid assuming that separate percentage improvements simply add together. Two projects may affect the same delay, and speeding up one operation may only increase the queue at the next.


Before expansion, confirm that the process works without the project team constantly supporting it. Document ownership, training, exception handling and support arrangements. Test whether the same approach suits another department rather than copying it unchanged.


Where Authentise can support the work

Authentise’s perspective centres on the movement of work and information between engineering, production and quality. A useful digital improvement preserves the connection between the job, its requirements, the decisions made and the resulting records.


Where production coordination is the problem, Authentise Flows can support manufacturing workflows and production information. The proposed configuration and integrations should be assessed against the process being improved.


Where engineering discussions and decision history are difficult to retrieve, Threads can keep that context connected to the work. It serves a different purpose from integrating production systems.


You can explore these applications through Authentise’s industrial manufacturing software.

The starting point remains the operational problem. Some improvements will come from clearer responsibilities or better use of existing systems; others will justify additional software.


Build the roadmap around the next useful change

A worthwhile first project gives an SME more than a new tool. It establishes a repeatable way to identify a problem, involve the people doing the work, test an improvement and judge the result.


Choose one recent job and follow its information through engineering, production and quality. Identify where somebody had to search, wait, re-enter data or reconstruct what happened. That gives your first digital project a concrete starting point.


If those handoffs are creating recurring delays or missing records, explore how Authentise supports connected manufacturing workflows and assess the fit against that specific process.

bottom of page
window.addEventListener("message", function (event) { // Inspect event.data in console to see what the bot emits if (!event.data) return; // Log all messages to see what your specific bot emits upon submission console.log("Chatbot message received:", event.data); // Check if the event matches a lead/submission event from the bot // (Replace 'form_submit' with the exact event name your chatbot emits) if ( event.data.type === "form_submit" || event.data.action === "lead_submitted" || JSON.stringify(event.data).includes("lead") ) { window.dataLayer = window.dataLayer || []; window.dataLayer.push({ event: "chat_interaction", element_id: "chatbot", form_id: "chatbot", action: "form_submission" }); } });