top of page
Newspapers

AUTHENTISE NEWS

Find all of Authentise's press releases, dev blogs and additive manufacturing thought pieces right here.

AM Printers Are Not the Bottleneck: The Real Constraint in Advanced Manufacturing

AM Printers Are Not the Bottleneck — Systems Are

Why advanced manufacturing slows down when workflows, data, and execution aren’t connected


TL;DR

If your additive manufacturing operation feels slow or unpredictable, the problem is rarely your AM printers. In advanced manufacturing, delays are usually caused by disconnected systems - fragmented workflows, manual scheduling, poor material visibility, and missing context between steps. Real performance gains come from fixing the system around the printer, not the printer itself.



The Common Assumption: Printers Are Holding Us Back

Search queries like:

  • Why is additive manufacturing so slow?

  • Are AM printers the bottleneck?

  • How do you scale advanced manufacturing?

often assume that the printer is the limiting factor.


It makes sense. AM printers are expensive, highly visible, and often blamed when delivery dates slip. But in real-world production environments, printers are rarely running at full, continuous utilisation.


They’re waiting.


Waiting for approved designs.Waiting for material release.Waiting for scheduling decisions.Waiting for post-processing capacity.Waiting for quality sign-off or documentation.

This isn’t a machine problem - it’s a systems problem.


A 3D printer in an industrial setting with metallic grey tones, illuminated interior, control panel display, and red alarm light on top.


Advanced Manufacturing Is a System, Not a Machine

Advanced manufacturing isn’t defined by having cutting-edge AM printers. It’s defined by how well the entire production system works together.

A typical additive manufacturing workflow includes:

  • Design and version control

  • Build preparation

  • Job scheduling and prioritisation

  • Material allocation and tracking

  • Printing

  • Post-processing

  • Inspection and quality

  • Traceability and reporting


If these steps aren’t connected, bottlenecks form everywhere except the printer itself.

This is why organisations often struggle even after investing heavily in new machines — a theme explored in The Real Cost of AM: Why Scaling Additive Isn’t Just About the Printer and Why Additive Manufacturing Struggles to Scale - and How to Fix It.



Where the Real Bottlenecks Actually Appear


1. Disconnected Workflows

When planning, execution, and reporting live in separate tools (or spreadsheets), handovers become manual and slow. Context is lost between teams, and delays compound.

This challenge is explored further in The Hidden Cost of AM Silos: Why Integration is Everything.


2. Manual Scheduling and Guesswork

Without system-level visibility into machine capacity, materials, and downstream processes, scheduling becomes reactive rather than optimised.

This is why automation alone doesn’t solve throughput issues — a point covered in Manufacturing Automation Software: Why Automation Fails Without Context & How to Fix It.


3. Poor Material Visibility

Printers frequently sit idle because:

  • The correct powder batch isn’t available

  • Material status is unclear

  • Reuse limits aren’t tracked confidently


Material uncertainty often looks like a printer issue, but it’s actually a materials management failure. See Why Manual Powder Logs Fail in Additive Manufacturing (And What to Use Instead) and Material Management in Additive Manufacturing: How to Reduce Waste, Increase Traceability, and Strengthen Quality.


4. Post-Processing Constraints

Printing may be fast, but parts often queue for heat treatment, machining, inspection, or finishing. If post-processing isn’t planned as part of the workflow, printers appear to be the bottleneck even when they aren’t.

This is explored in more depth in the main pillar article:👉 The Role of Automation in Optimising 3D Printing Processes | Additive Manufacturing Workflows



Why Buying More AM Printers Rarely Fixes the Problem

When throughput stalls, the default response is often to add another machine.

In practice, this usually leads to:

  • Higher capital costs

  • More complex scheduling

  • Increased material risk

  • The same delays - just scaled up


This is the point where many teams start asking questions like “Do I really need an MES?” or “What’s the difference between a legacy MES and a next-gen MES?”

The answer lies in system coordination, not hardware expansion.



What Actually Unlocks Performance in Advanced Manufacturing

High-performing AM operations focus on system visibility and control, not just machine speed.


This typically includes:

  • A connected manufacturing execution layer (such as Authentise Flows) to coordinate work across machines, people, and processes

  • A Digital Design Warehouse to manage design versions, access control, and traceability

  • Structured Materials Management to track material status, reuse, and genealogy with confidence

  • Capturing engineering intent and decisions through tools like Threads, so knowledge isn’t lost between teams.


Together, these systems turn printers from isolated assets into predictable, schedulable production resources.

This approach aligns with the principles discussed in:


System Thinking Is the Difference Between Experimentation and Production

If you’re searching for answers to:

  • Why can’t we scale additive manufacturing?

  • Why are our AM printers underutilised?

  • Why is our AM operation unpredictable?

The issue is rarely the printer.


Advanced manufacturing succeeds when:

  • Workflows replace tribal knowledge

  • Systems replace spreadsheets

  • Decisions are made with full production context

Or put simply:

AM printers don’t limit scale. Disconnected systems do.



What to Explore Next

If this challenge sounds familiar, these articles go deeper into the system-level fixes:

Each builds on the same idea: advanced manufacturing is won or lost at the system level, not the machine level.

Recent Posts

See All
authentise

info@authentise.com
HQ: 701 S 50th Street, Philadelphia, 19143 USA

UK Office: 33 Foley Street, London, W1W 7TL, UK

  • LinkedIn
  • Twitter
  • YouTube
  • Facebook

SOLUTIONS

About

Support

3mff-removebg
america makes
MXD Logo
AMUG
AMT Large

AUTHENTISE © 2023. ALL RIGHTS RESERVED   |   Privacy Policy   |   Terms of Use

We improve our products and advertising by using Microsoft Clarity to see how you use our website. By using our site, you agree that we and Microsoft can collect and use this data. Our privacy statement has more details.

bottom of page